Overburden production · next 30 days
 m³
Loading the projection...
Day and shift

Decisions needed

When a machine breaks down or an operator takes a sudden leave, these cards show what it costs and what you can do. The number of machines is fixed, so the choices are: ask the engineer to fix it faster, ask the crews to shorten the trip time, or call overtime.

Try a scenario (nothing is saved)

Planned maintenance

Future maintenance planned by the Maintenance Engineer. Each card shows what it costs in production and whether it is better to prepone or postpone it, using leave, spare machines and the extra risk of a late service.

Timeline: next 30 days

Projected production: next 30 days

What if? Move the sliders

Try a different number of machines or operators and see the projection change. This does not change any real data.

Production calendar

Each day shows projected production. Tap a day to see its allotment.

Weaker dayStronger day

Production by shift (selected day)

HEMM condition by type

Operators by shift (selected day)

Breakdown chance by machine

A longer bar means the machine is more likely to break down in a shift.

Top operators by efficiency

Free manpower

Needs attention

Allotment

Loading...

Machines

Operators

How the projection is worked out