Overburden production · next 30 days
m³
Loading the projection...
Day and shift
Decisions needed
When a machine breaks down or an operator takes a sudden leave, these cards show what it costs and what you can do. The number of machines is fixed, so the choices are: ask the engineer to fix it faster, ask the crews to shorten the trip time, or call overtime.
Try a scenario (nothing is saved)
Planned maintenance
Future maintenance planned by the Maintenance Engineer. Each card shows what it costs in production and whether it is better to prepone or postpone it, using leave, spare machines and the extra risk of a late service.
Timeline: next 30 days
Projected production: next 30 days
What if? Move the sliders
Try a different number of machines or operators and see the projection change. This does not change any real data.
Production calendar
Each day shows projected production. Tap a day to see its allotment.
Weaker dayStronger day
Production by shift (selected day)
HEMM condition by type
Operators by shift (selected day)
Breakdown chance by machine
A longer bar means the machine is more likely to break down in a shift.
Top operators by efficiency
Free manpower
Needs attention
Allotment
Loading...